Mercedes S-Class W-220

since 1998 of release

Repair and car operation



W220 Mercedes
+ Mercedes-Benz Cars of a class S (W220)
+ Operation manual
+ Routine maintenance
+ Engine
+ cooling and heating Systems
+ Power supply system and release
+ engine Electric equipment
- Automatic transmission
   Problems of the block of electronic control and operating signals
   Search of malfunctions - the general information
   Removal and AT installation with the hydrotransformer
   The AT electrohydraulic control unit (AT is established)
   Dismantling and assembly of the electrohydraulic control unit
   Dismantling and assembly of a plate of gear shifting
   Case of transmission and hydrotransformer
   Multidisk brakes В2, VZ and a blocking gear wheel at "Parking"
   Dismantling and assembly of a back hollow shaft with the back coupling of a free wheeling
   Removal and installation of multidisk brake В1 and oil pump
   Dismantling and assembly of the oil pump
   Dismantling and assembly of multidisk brake В1
   Dismantling and assembly of multidisk brake В2
   Dismantling and assembly of a target shaft with the central and back block of planetary gear wheels
   Removal and installation of multidisk couplings К1, К2 and К3
   Dismantling and assembly of coupling К1
   Dismantling and assembly of a leading shaft with coupling К2 and the forward block of planetary gear wheels
   Dismantling and assembly of coupling К3
   The blocking mechanism at "parking"
   Removal and installation of the lever of the selector of gear shifting
+ Power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Cхемы





Dismantling and assembly of a plate of gear shifting

And — the Valve of adjustment of working pressure. Valve of adjustment of pressure of greasing. The valve of adjustment of overlapping at inclusion of 2-3 transfers
In — the Block of inclusion of 1-2/4-5 transfers
Valve of adjustment of pressure of gear shifting

With — the Block of inclusion of 3-4 transfers
D — the Block of inclusion of 2-3 transfers
Coupling of blocking of the adjusting valve. Adjusting B2 valve


Dismantling of a plate of gear shifting

71 — Bolts
72 — the Cover of the case of valves
73 — the Sealing plate

74 — the Case of valves
82 — the Clamp


Dismantling of a plate of gear shifting

59 — the Directing finger
75 — Plastic ball valves

76 — Steel ball valves
143 — the Central clamp


Dismantling of a plate of gear shifting

72 — the Case of valves
72.1 — Valve of a choice of transfer
72.2 — The valve of adjustment of overlapping of 2-3 transfers with the plug and the piston
72.3 — Valve of adjustment of pressure of greasing
72.4 — Valve of adjustment of working pressure

72.5 — Valve of fixing of inclusion of 3-4 transfers
72.6 — The operating valve of inclusion of 3-4 transfers
72.7 — The valve of switching of pressure at inclusion of 3-4 transfers
72.8 — Valve of adjustment of overlapping 3-4


Dismantling of a plate of gear shifting

74 — the Case of valves
74.14 — The operating valve of inclusion of 1-2/4-5 transfers
74.15 — Valve of fixing of inclusion of 1-2/4-5 transfers
74.18 — The valve of adjustment of overlapping of 1-2/4-5 transfers with the plug and the piston
74.19 — Valve of adjustment of pressure of gear shifting
74.20 — Valve of adjustment of pressure of the adjusting valve
74.21 — The valve of adjustment of pressure of the switching valve

74.22 — Valve of adjustment of blocking hydrotransformer
74.24 — The valve of switching of pressure at inclusion of 3-4 transfers
74.25 — The operating valve of inclusion of 2-3 transfers
74.26 — Valve of fixing of inclusion of 2-3 transfers
74.27 — Valve of switching В2


The plate of gear shifting is shown on an illustration.

Dismantling

 PERFORMANCE ORDER

1. Unscrew clamps 82.
2. Unscrew bolts 71.
3. Uncover cases of valves 72 the case of valves 74.
4. Remove a sealing plate 73. All 12 balls are located in the case of the valves, four 75 of which - plastic, other 8 76 - steel.
5. Unscrew covers of the case of valves. Plugs and pistons of adjusting valves 72.2, 72.8 and 74.18 should not be mixed. The valve of switching В2 can be removed and established, when the cover of the case of valves is removed.


Assembly

 PERFORMANCE ORDER

Assembly is carried out as it should be, the return to dismantling. Insert directing finger 59 into the case of valves (shooter).