Mercedes S-Class W-220

since 1998 of release

Repair and car operation



W220 Mercedes
+ Mercedes-Benz Cars of a class S (W220)
+ Operation manual
+ Routine maintenance
+ Engine
+ cooling and heating Systems
+ Power supply system and release
+ engine Electric equipment
- Automatic transmission
   Problems of the block of electronic control and operating signals
   Search of malfunctions - the general information
   Removal and AT installation with the hydrotransformer
   The AT electrohydraulic control unit (AT is established)
   Dismantling and assembly of the electrohydraulic control unit
   Dismantling and assembly of a plate of gear shifting
   Case of transmission and hydrotransformer
   Multidisk brakes В2, VZ and a blocking gear wheel at "Parking"
   Dismantling and assembly of a back hollow shaft with the back coupling of a free wheeling
   Removal and installation of multidisk brake В1 and oil pump
   Dismantling and assembly of the oil pump
   Dismantling and assembly of multidisk brake В1
   Dismantling and assembly of multidisk brake В2
   Dismantling and assembly of a target shaft with the central and back block of planetary gear wheels
   Removal and installation of multidisk couplings К1, К2 and К3
   Dismantling and assembly of coupling К1
   Dismantling and assembly of a leading shaft with coupling К2 and the forward block of planetary gear wheels
   Dismantling and assembly of coupling К3
   The blocking mechanism at "parking"
   Removal and installation of the lever of the selector of gear shifting
+ Power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Cхемы





Removal and installation of the lever of the selector of gear shifting

Removal and installation of the lever of the selector of gear shifting (with the regime W/S switch)

9 — Laying
40 — Bolts (4 pieces)
97 — the Intermediate lever
S16/10 — the Switch of identification of the included transfer

S16/10s2 — the Switch of lamps of a backing
Y66/1 — the Electromagnetic drive of blocking of the provisions "R/P"


Removal

 PERFORMANCE ORDER

1. Remove the switching lever from the intermediate lever 97.
2. Remove the central console.
3. Unscrew bolts 40.
4. Disconnect sockets and an electromagnetic drive of blocking of the provisions "R/P" Y66/1 from the identification S16/10 switch, the switch of lamps of a backing of S16/10S2.
5. Remove the lever of the selector of gear shifting assembled from a floor.


Installation

 PERFORMANCE ORDER

Installation is carried out as it should be, the return to removal. Check on correctness of installation laying 39 and its condition if it is necessary, replace it.