Mercedes S-Class W-220

since 1998 of release

Repair and car operation



W220 Mercedes
+ Mercedes-Benz Cars of a class S (W220)
+ Operation manual
+ Routine maintenance
+ Engine
+ cooling and heating Systems
+ Power supply system and release
+ engine Electric equipment
- Automatic transmission
   Problems of the block of electronic control and operating signals
   Search of malfunctions - the general information
   Removal and AT installation with the hydrotransformer
   The AT electrohydraulic control unit (AT is established)
   Dismantling and assembly of the electrohydraulic control unit
   Dismantling and assembly of a plate of gear shifting
   Case of transmission and hydrotransformer
   Multidisk brakes В2, VZ and a blocking gear wheel at "Parking"
   Dismantling and assembly of a back hollow shaft with the back coupling of a free wheeling
   Removal and installation of multidisk brake В1 and oil pump
   Dismantling and assembly of the oil pump
   Dismantling and assembly of multidisk brake В1
   Dismantling and assembly of multidisk brake В2
   Dismantling and assembly of a target shaft with the central and back block of planetary gear wheels
   Removal and installation of multidisk couplings К1, К2 and К3
   Dismantling and assembly of coupling К1
   Dismantling and assembly of a leading shaft with coupling К2 and the forward block of planetary gear wheels
   Dismantling and assembly of coupling К3
   The blocking mechanism at "parking"
   Removal and installation of the lever of the selector of gear shifting
+ Power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Cхемы





Dismantling and assembly of a target shaft with the central and back block of planetary gear wheels

42 — the Target shaft with the central block of planetary gear wheels
42а — the Needle bearing
42b — Teflon rings
42с, 43а — Persistent laying
42d — the Persistent needle bearing
42е — Laying

42f — the Lock ring
43 — the Back block of planetary gear wheels
44 — KZ Coupling
45 — the Back hollow shaft
With — the Final oil channel for KZ coupling
D — the Inlet oil channel for KZ coupling


Gap check between laying 42е and a lock ring 42f

42 — the Target shaft
42с — Persistent laying
42d — the Needle bearing

42е — Laying
42f — the Lock ring
44 — KZ Coupling


Dismantling

 PERFORMANCE ORDER

1. Disconnect the transmission case from the case the hydrotransformer.
2. Remove multidisk couplings К1, К2 and KZ.
3. Remove up two visible teflon rings 42b from a target shaft.
4. Remove a lock ring 42f, laying 42е, the persistent needle bearing 42d and persistent laying 42с from a target shaft.
5. Remove KZ 44 coupling.
6. Remove a back hollow shaft 45 from a target shaft.
7. Remove the back block of planetary gear wheels 43 with the integrated hollow shaft, the central block of planetary gear wheels from a target shaft.
8. Remove persistent laying 43а.
9. Remove multidisk brake В1 and the oil pump.


Assembly

 PERFORMANCE ORDER

1. Establish persistent laying 43а a cuff in the direction to водилу.
2. Establish the back block of planetary gear wheels 43 with the integrated hollow shaft, the central block of planetary gear wheels on a target shaft.
3. Grease and establish three bottom teflon rings 42b in a groove so that they were established together.
4. Establish a back hollow shaft 45 on a target shaft. Check sealing rings on a hollow shaft and replace them if it is necessary.
5. Establish KZ couplings.
6. Establish a lock ring, laying, the persistent needle bearing and persistent laying.
7. Grease and establish two top teflon rings 42b in a groove so that they were established together.
8. Check an axial gap between laying 42е and a lock ring 42f. It should make 0.15 - 0.6 mm. Adjust a gap by means of laying 42е. Thickness of laying: 3.0, 3.4 and 3.7 mm.
9. Establish multidisk couplings К1, К2 and KZ.





home