Mercedes S-Class W-220

since 1998 of release

Repair and car operation



W220 Mercedes
+ Mercedes-Benz Cars of a class S (W220)
+ Operation manual
+ Routine maintenance
- Engine
   Compression check in engine cylinders
   Engine check by means of the vacuum gage
   Belt of a streaming drive of auxiliary units
   Gas-distributing mechanism and engine elements
   Replacement of chains of a drive of GRM and installation of phases of a gazoraspredeleniye
   Location of the main sensors of the petrol engine
+ cooling and heating Systems
+ Power supply system and release
+ engine Electric equipment
+ Automatic transmission
+ Power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Cхемы





Replacement of chains of a drive of GRM and installation of phases of a gazoraspredeleniye

Scheme of a chain drive of the gas-distributing mechanism (GRM) and stages of procedure of installation of phases of a gazoraspredeleniye. V6 engines


Scheme of a chain drive of the gas-distributing mechanism (GRM) and stages of procedure of installation of phases of a gazoraspredeleniye (The diesel engine of 3.2 l)


V6 engine

Special tools:

Cover for camshaft fixing - No. 112589054000.
Key for camshaft fixing - No. 112589000100.
Key under a bolt of an asterisk of a camshaft - No. 112589010300.
The adaptation for fixing of the left camshaft - No. 112589013200.
The adaptation for fixing of the right camshaft - No. 112589003200.
The adaptation for fixing of a pulley of a cranked shaft - No. 112589004000.
The adaptation for flywheel blocking - No. 112589034000.
Set for division of links of a gas-distributing chain - No. 602589024000.
Divider of links of a gas-distributing chain (element 1) - No. 602589023300.
Divider of links of a gas-distributing chain (element 2) - No. 602589056300.
Divider of links of a gas-distributing chain (element 3) - No. 602589056301.
The adaptation for joining of links of a chain - No. 602589003900.
Set of dies for joining of links of a chain - No. 103589016300.
Tool box - No. 602589009800.
Adaptations for chain fixing on asterisks of camshafts - No. 112589044000.
The holder of a pulley of the vyazkostny coupling - No. 113589004000.
Key for fixing of the vyazkostny coupling - No. 113589000100.

General measures of precaution

 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.
2. Turn out spark plugs for the purpose of simplification of a provorachivaniye of the engine.
3. If the return is not stipulated especially, turn the engine in the normal direction.
4. Familiarize with the requirements shown to efforts of a tightening of carving connections.
5. At the corresponding complete set mark position of the CKP sensor before its removal.
6. Do not turn a cranked shaft by means of driving asterisks of a camshaft or devices.
7. Do not turn cranked and distributive shaft at the removed chain of a drive of GRM.


Procedures of installation of phases of a gazoraspredeleniye

 PERFORMANCE ORDER

1. Bring the piston of the first cylinder [1] into situation 40 ° after VMT.
2. Make sure of correctness of combination of parallel flutes of both camshafts with a cut of a head of cylinders [2].
3. Establish on camshafts blocking adaptations [3].
4. On engines 112 check correctness of an arrangement of adjusting labels of a balancing shaft [4].
5. Before starting performance of repair procedures, remove assembly of a natyazhitel [5].

At installation of the piston of the first cylinder in situation 40 ° after VMT camshafts can be turned without risk of contact of valves with the bottoms of pistons.

6. At assembly bring the piston of the first cylinder into situation 40 ° after VMT and achieve combination of omednenny links of a chain with:

  • Adjusting labels of asterisks of both camshafts [6];
  • For engines 112: with an adjusting label on an asterisk of a balancing shaft [7];
  • With a shponka and an adjusting label of a cranked shaft [8].

On termination of installation combination of omednenny links of a chain should occur on every fourteenth turn.


Replacement of a gas-distributing chain

 PERFORMANCE ORDER

1. Remove assembly of an axis of yokes of the right camshaft assembled with covers of bearings.
2. Without tightening fixture, establish a cover of fixing of a camshaft [9] (the special tool No. 112589054000).
3. Establish adaptations for chain fixing on asterisks of camshafts (the special tool No. 112589044000).
4. By means of adaptations from given above the list connect a new chain to old on the right number of cylinders, - for chain putting on on asterisks turn a cranked shaft.

Bolts of fastening of assemblies of axes of yokes (М7х84 mm) are not subject to a reuse and should be replaced.

Removal of a balancing shaft on engines 112 is made in the following order:

  • Pass a suitable blocking core in a counterbalance on a back pin of a shaft [11];
  • Turn out a fixing bolt and remove a counterbalance;
  • From the forward party take a balancing shaft;
  • In the course of assembly do not forget to grease the central bolt of a pulley of a cranked shaft.

Do not block a flywheel / a driving disk at removal/installation of a bolt of a pulley of a cranked shaft.


Diesel engine of 3.2 l

Special tools:

Core for camshaft fixing - No. 111589031500.
The adaptation for flywheel fixing / a driving disk (a transmission dome) - No. 601589024000.
Bolts of fastening of the adaptation for flywheel fixing / a driving disk (a transmission dome) - М6х90 mm.
The adaptation for flywheel fixing / a driving disk (an opening under starter installation) - No. 602589004000.
Set for division of links of a gas-distributing chain - No. 602589024000.
Divider of links of a gas-distributing chain (element 1) - No. 602589023300.
Divider of links of a gas-distributing chain (element 2) - No. 602589046300.
Divider of links of a gas-distributing chain (element 3) - No. 602589046301.
The adaptation for joining of links of a chain - No. 602589003900.
Set of 1 dies for joining of links of a chain - No. 103589026300.
Set of 2 dies for joining of links of a chain - No. 103589036300.
Set of 3 dies for joining of links of a chain - No. 103589096300.
Tool box - No. 602589009800.

General measures of precaution

 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.
2. Turn out glow plugs for the purpose of simplification of a provorachivaniye of the engine.
3. If the return is not stipulated especially, turn the engine in the normal direction.
4. Familiarize with the requirements shown to efforts of a tightening of carving connections.
5. At the corresponding complete set mark position of the CKP sensor before its removal.
7. Do not turn cranked and distributive shaft at the removed chain of a drive of GRM.
8. After installation of phases of a gazoraspredeleniye make TNVD check.


Procedures of installation of phases of a gazoraspredeleniye

 PERFORMANCE ORDER

Replacement of a gas-distributing chain can be made without engine dismantle. Use special tools from given above the list. The new chain can be connected to old, is thrown an asterisk and then joined.

1. Bring the piston of the first cylinder [1] into situation VMT.
2. Pass a blocking core in an asterisk of an inlet camshaft [2].
3. Make sure of correctness of combination of adjusting labels of camshafts [3] and [4].
4. Before starting performance of repair procedures, remove assembly of a natyazhitel [5].

Bolts of fastening of asterisks of camshafts are not subject to [6] reuse and should be replaced with the new.

5. On termination of repair work establish a natyazhitel [5].

Effort of a tightening of fixture: 80 N · m.

Effort of a tightening of a bolt of a pulley of a cranked shaft [7]:

  • Bolt of classification of 8.8 200 N · m + 90 °;
  • Bolt of classification of 10.9 325 N · m + 90 °.




home